home
products/services
home
what's new?
success stories
home
contact us
 

Installation Guide for IGT
I-Game (I-Plus) Upright

Prepare Machine for Installation

  • Perform any audit, operational and/or security procedures required to open machine door.
  • Open machine and turn off all power
  • Remove Main Payout Hopper
  • Remove monitor if installing candle LED

 

Prepare Support Parts

 
Lay out parts
  Disconnect Receiver from harness assembly. Locate interface cable and unplug candle LED adapter

Legs and Brackets

 
Install left leg, screw and tighten.
Left leg has bracket and is mounted
nearest connector
  Install right leg, screw and tighten
Channels face inward
 
Install hook bracket, screw and tighten.
Note location of hook bracket to
PCB
  Install hole bracket, screw and tighten

Front Support Bracket

 
Remove Lanyard   
  Using lanyard hole install bracket,
replace lanyard and tighten
 
Using the bracket as a template, drill hole, use screw and tighten
  Repeat step 3

Candle LED installation

 
Install LED in candle and route wires downward behind reels/monitor to payout hopper

Insert candle LED wires into adapter
#5 Hole – Green, #6 Hole – Red,
#9 Hole - Orange


Install Transmitter and Receiver

 
Separate Probe assembly and transmitter Power Cable Blue wire to probe, Black wire to ground washer
Install transmitter onto mounting bracket. Please note location of PCB

Transmitter and Receiver

 
Unscrew/ Insert transmitter onto 19 pin plug on payout hopper, re-tighten screws
Slide receiver/bracket onto 19 pin plug

Install Hopper Probes

 
Probe should be inserted using the lowest pre-existing hole on the hopper. If not applicable, hole must be drilled   Position ground washer location low and flat, drill hole and tighten


This represents a typical probe and ground washer locations
Run probe wires underneath hopper from power

Transmitter Power Connection

 
Connect Transmitter Power Cable to PCB   Connect Transmitter Power Cable to Transmitter Assembly

Transmitter Power Cable Exceptions

 
If this connection is not available, you will need the following >
  12 or 16
pin

Power Connections

 
Connect power supply to
available outlet with extension
if needed
  Connect power supply to
controller PCB
 
Connect Receiver to extension from
Controller PCB
  Connect interface cable to
candle LED

Install Support Structure

 
Please make sure legs are straight and evenly spaced Insert hook bracket into opening, screw and tighten hole bracket into pre-drilled front bracket hole.



Install Attendant Hopper

 
When inserting Attendant please pull up on stop to insert fully.



Re-install Hopper and Fill Both Units

 
 


 
     

Copyright©2003, Glenview Systems, Inc. All Rights Reserved.
Home | Gaming Products | Resource Library | What's New? | Success Stories
Glenview Attendant | Demo CD | Contact Us
Web Design by: Christopher Merrill Web Design