home
products/services
home
what's new?
success stories
home
contact us
 

Installation Manual for IGT
S+ PE+ Slant Tops

Prepare Machine for Installation

  • Open Machine
  • Disconnect All Power
  • Perform any Audit necessary
  • Remove Coin Chute
  • Remove Payout Hopper
  • Remove and Secure Coins

Remove Coin Chute and Hopper

 
If Video, remove monitor

Install Mounting Brackets

 
Use Existing Hardware

Unpack and Install Probes

 
Disconnect Power Cable from Assy

Install Hopper Probe and Ground Washer

 
Use washer as a drill template | Use lower hole if applicable    
 

On Payout Hopper

 
Remove 19 pin plug
from payout hopper
Install the Transmitter Bracket
onto plug using existing hardware

Install Ground and Connect Power Cable

 
Connect the Attendant Power Cable “Green” wire to ground
Disconnect “Red” hopper cable and attach Attendant Power Cable

Transmitter and Receiver

 
Re-Connect Power Cable to
Attendant transmitter Cable
Install Receiver
Bracket onto 19 pin plug

Candle LED and Power

 
1 Route Candle LED, wiring through opening in machine, to top box for installation.
3 Tie wrap cables to machine sides avoiding tangle or cutting.

Install Attendant

 
1 Connect receiver cable to Controller PCB   2 Plug in power to Attendant
3 Slide Attendant onto attached
brackets and tighten
   
 

Ready for Operation

 
Fill coins in Attendant making sure coins are touching
both contact areas, LED’s will be green

Please Note

 
For machines prior to 1992 – with a locking latch installed on
the left side of the door. A separate drill template may be
needed to re-locate (locking latch) to right side of door,
to avoid any clearance issues.

Warranty and Reference
Warranty, Electrical and Technical Information can be found in any
S+ Upright Manual.
Thank you, enjoy our product!
 
     

Copyright©2003, Glenview Systems, Inc. All Rights Reserved.
Home | Gaming Products | Resource Library | What's New? | Success Stories
Glenview Attendant | Demo CD | Contact Us
Web Design by: Christopher Merrill Web Design